top of page

COMPLETED PROJECTS

AMRUN

Rio Tinto Weipa Qld

Bulk Earthworks 2016-2017

RMA CIVIL CONSTRUCTION

Rio Tinto Alcan - Yarwun Qld

- Construction of Tailings Dam Wall raises and associated works- Zoned Embankment- Construction of Coffer dams

TAILINGS STORAGE FACILITY TSF11

BHP Billiton GEMCO - Groote Eylandt, NT

A- 2,000,000 m3 High Risk Tailings Structure- Establishment of a white rock quarry to produce 70,000 tonnes of specifically graded rock- Decant Structuredd News Story here

BRUCE HIGHWAY - COOROY TO CURRA

Beilby Holdings for TMR Queensland - Cooroy Qld

- Duplication of 8km of the Bruce Highway

- Approx. 3,000,000m3 of cut to fill activities in extremely steep and challenging terrain

- Construction of 3 grade separated intersections

- Construction of a major interchange at the southern end of the job

- Necessitated construction in 3 stages, requiring traffic shifts between each.

1 SOUTH DAM REPLACEMENT

BHP Mitsubishi Alliance - Peak Downs (Bowen Basin)

- Construction of a Diversion Channel

- Control Structures

TAILINGS STORAGE FACILITY TSF 14

BHP Billiton GEMCO - Groote Eylandt

- 900,000m3 Embankment Construction

- Decant Ramp

- Spillways

- Polishing Pond

HOPELANDS & PUNCHBOWL PILOT DAMS

Arrow Energy - Surat Basin

- 2 x PIlot Dams

- Underliner drainage system

- Fully Lined dams

WOLEEBEE FCS PAD CONSTRUCTION

QGC & Thiess - Wandoan QLD

- Construction of 2 x FCS Pads

- 2.5km of Haul Road

- Hard stand pad for Permanent Site Offices

WEIPA CELL 3 WALL RAISE

Rio Tinto Alcan - Weipa

- 300,000m3 Embankment Zoned Construction - - Upstream raise of Cell 3

- Decant Structure

- Spillway

EMERALD RIVER ROAD REALIGNMENT

BHP Billiton GEMCO - Groote Eylandt

- 5.5km of Public Access Road Realignment

- Traffic Management

- Drainage works & protective treatments

TAILINGS STORAGE FACILITY TSF12

BHP Billiton GEMCO - Groote Eylandt

- Embankment Construction

- Significant mudfarming

 

HARRY BROADWATER FCS PAD CONSTRUCTION

March 15, 2013

- Construction of FCS Pads

- 2.5km Haul Road

WEIPA HAUL ROAD CONSTRUCTION

Rio Tinto Alcan - Weipa

Accelerated construction of 7km of Haul Road to be included into Rio Tinto Alcan's mine haul road network.

The Practical Completion of this project was achieved one month early.

POND 8 STAGE 2 CONSTRUCTION

Rio Tinto Alcan - Gove

- 1,429,000m3 Embankment Construction

- Seepage collection through underdrainage system, sand blanket and chimney drain

- Concrete Spillway

CHRISTMAS CREEK & SOUTHERN HAUL RD

Watpac Civil and Mining

Construction of 12km of Haul Road through flood-prone area. 

POND 8 STAGE 1 CONSTRUCTION

Rio Tinto Alcan - Gove

- 1,000,000 m3 Embankment Construction

- Seepage collection

- Underdraiange System

- Sand Blanket

- Chimney Drain

- Concrete Spillway

Please reload

bottom of page